×

Warning

JUser: :_load: Unable to load user with ID: 851

Log in
updated 24 February 2020 - 07:45

1st Composite Oil Pipeline Operational in Marun


 TEHRAN, July 12 (Shana) – The first composite oil pipeline has been put into operation in Marun region of Khouzestan Province by the Research Institute of Petroleum Industry (RIPI).

Head of the downstream research department of the RIPI, Mansoor Bazmi, told Shana that RIPI in partnership with National Iranian South Oil Company (NISOC) had coined the formula for production of the composite pipeline for transfer of crude and testing and operation of the pipeline, thus taking a big step towards omitting expenses of erosion of the oil pipelines.
He noted that the first composite pipeline for transfer of crude is 10 kms long between Marun three and four.

Last modified onSunday, 13 November 2016 14:49

Leave a comment

Make sure you enter all the required information, indicated by an asterisk (*). HTML code is not allowed.

تک وب دیزاین-قالب فارسی جوملا